Following Joe Vasile's instructions, I too was able to complete the rigging in about 45 minutes. All the contrrols are connected, and the pitot/static system is hooked up. I think I will call the FAA for an inspection appointment tomorrow.

scaled.sam_0614.jpg

Next come the cowlling, javelins and the covers for the leather strut cuffs.

I measured the CG yesterday too. I was happy that it came out at 19" AOD.